BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20150116T150000Z
DTEND:20150116T153000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Ribbon Cutting for New Sheltered Bus Stop
DESCRIPTION:The City of Hattiesburg\, Mississippi Power and Area Development Partnership will host a ribbon cutting at the site of the newly constructed sheltered bus stop located on Highway 42 Bypass in Hattiesburg on Friday\, January 16 at 9 a.m. Mississippi Power provided  funding of  $7\, 500 for construction cost. The City of Hattiesburg's Mass Transit Division provided the shelter which was previously purchased with Federal Transit Authority (FTA) grant funds. The City of Hattiesburg Public Works Department installed the sheltered bus stop and also enhanced the site with sidewalks\, curbing\, railing\, sod\, etc.
X-ALT-DESC;FMTTYPE=text/html:<div style="text-align: center\;">&nbsp\;</div>\n<span style="font-family:times new roman\,serif\;"><span style="font-size:12.0pt\;">The City of Hattiesburg\, Mississippi Power and Area Development Partnership will host a ribbon cutting at the site of the newly constructed sheltered bus stop located on Highway 42 Bypass in Hattiesburg on Friday\, January 16 at 9 a.m. Mississippi Power provided &nbsp\;funding of &nbsp\;$7\, 500 for construction cost. The City of Hattiesburg&rsquo\;s Mass Transit Division provided the shelter which was previously purchased with Federal Transit Authority (FTA) grant funds. The City of Hattiesburg Public Works Department installed the sheltered bus stop and also enhanced the site with sidewalks\, curbing\, railing\, sod\, etc.</span></span>
LOCATION:Hwy 42 Bypass
UID:e.475.1627
SEQUENCE:3
DTSTAMP:20260411T094228Z
URL:http://2fwww.theadp.com/events/details/ribbon-cutting-for-new-sheltered-bus-stop-01-16-2015-1627
END:VEVENT

END:VCALENDAR
